Electrical work for renovations

Home Renovation Electrical Work

Plan the electrical side of your renovation before walls close and finishes go in. Forward Electrical handles design input, first fix, second fix, upgrades, testing and certification.

Modern kitchen and living space following a home electrical renovation
Plan before first fixFewer changes, delays and compromises later
Safe Electric Registered
First and second fix
Testing and certification
Clear project scope
Plan it early

Electrical decisions shape how the finished home works

Socket positions, lighting circuits, kitchen loads and future technology are easiest to solve before plastering, joinery and decoration begin.

Discuss your renovation
01

How each room will be used

Plan sockets, switches, data points and lighting around furniture, appliances and everyday movement.

02

Kitchen and utility loads

Confirm appliances and dedicated circuits before cabinetry and finished surfaces restrict access.

03

Lighting and controls

Choose practical switching positions, dimming, feature lighting and outdoor controls at design stage.

04

Existing electrical capacity

Assess whether the fuse board, earthing, bonding and existing circuits can support the proposed work.

05

Future requirements

Consider EV charging, solar, heat pumps, home offices, security and data cabling while access is available.

Renovation does not automatically mean a full rewire. The right scope depends on the age and condition of the existing installation, the extent of the alterations and what testing reveals.
What we can cover

Electrical services for renovation projects

From a kitchen refit to a substantial extension, the electrical scope is built around the property and the plans.

Plan

Electrical layout planning

Practical input on socket, switch, light, appliance and equipment positions before work begins.

Install

New circuits and wiring

New or altered circuits for renovated rooms, extensions and additional electrical demand.

Kitchen

Kitchen electrical work

Circuits and connection points for cooking, refrigeration, extraction, lighting and countertop use.

Bathroom

Bathroom electrics

Suitable lighting, extraction, electric showers and other work planned for the bathroom environment.

Light

Indoor and outdoor lighting

General, task, feature, security and garden lighting with appropriate switching and controls.

Connect

Power and data points

Additional sockets, TV points and structured cabling for work, entertainment and connected devices.

Protect

Fuse board assessment

Review of existing capacity and protection, with replacement where the board is unsuitable for the new work.

Fuse board replacement →
Rewire

Partial or complete rewiring

Replacement of existing wiring where inspection, testing and the renovation scope show it is required.

Read about home rewiring →
Verify

Testing and certification

Final inspection, testing and applicable completion certification for the completed electrical work.

Project stages

From plans to final handover

Electrical work is delivered in stages so cabling goes in before surfaces close and finished fittings are protected from heavy building work.

Phase 01

Survey and scope

  • Review plans and room use
  • Assess the existing installation
  • Confirm power and lighting points
  • Identify board or capacity issues
  • Agree a clear electrical scope
Phase 02

First fix

  • Install concealed cabling
  • Position boxes and routes
  • Prepare circuits for equipment
  • Coordinate before plastering
  • Check changes before walls close
Phase 03

Second fix and handover

  • Fit sockets and switches
  • Install agreed light fittings
  • Connect equipment and controls
  • Label circuits clearly
  • Test and issue documentation
Our process

A controlled electrical workstream

Clear decisions and timely access help keep the electrical package aligned with the wider build.

Share the project details

Send the address, plans where available, project stage, expected dates and the main work being completed.

Survey the property

We review the existing installation and discuss how the renovated rooms need to work.

Confirm scope and quotation

The agreed scope sets out the electrical work, assumptions and identifiable upgrade requirements.

Complete first and second fix

Visits are coordinated around demolition, framing, plastering, joinery and installation of finished equipment.

Test and hand over

The finished installation is checked, circuits are identified and the applicable certification is provided.

Good coordination matters

Electrical work needs the right information at the right time

Late layout changes can mean reopening finished surfaces, moving cabinetry or compromising the result. Early decisions give the electrician, builder and other trades a shared plan.

Final kitchen and bathroom layouts before first fix
Confirmed positions for appliances and fixed equipment
Lighting and switching decisions before plastering
Clear responsibility for fittings supplied by the client
Access dates aligned with the building programme
Professional standards

Registered, tested and documented

Forward Electrical is Safe Electric Registered. Completed electrical work is inspected and tested, with the applicable certification provided for your records.

For electrical work in the home, the Commission for Regulation of Utilities advises using a Safe Electric Registered Electrical Contractor.

Coverage

Areas we serve

Forward Electrical provides home renovation electrical work across its established service area. Contact us if your location is not listed and we will confirm availability.

SwordsMalahidePortmarnockDonabateNorth DublinDublin City

Could the project need a rewire?

Our detailed guide explains the factors that affect rewire scope, access, disruption and cost.

Read the rewire cost guide
Common questions

Home renovation electrical FAQs

When should I involve an electrician in a renovation?
As early as possible, ideally while layouts are still being planned and before first fix. Early input helps confirm socket, lighting, appliance and circuit requirements before finished surfaces restrict access.
What is first fix electrical work?
First fix is the installation of concealed cabling, back boxes and circuit routes before walls and ceilings are plastered or closed.
What is second fix electrical work?
Second fix takes place after plastering and much of the finishing work. It includes fitting sockets, switches, light fittings and other visible electrical accessories, followed by testing and commissioning.
Does a renovation mean the house needs rewiring?
Not necessarily. The correct scope depends on the age and condition of the existing installation, test results, the rooms being altered and the new electrical demand. Some projects need only new or modified circuits, while others justify a partial or complete rewire.
Can you work from architectural or kitchen plans?
Yes. Plans are useful for establishing layouts, but appliance specifications, lighting decisions and equipment requirements should also be confirmed before first fix.
Can I supply my own light fittings and accessories?
This can be discussed during scoping. Product suitability, quantities, delivery dates and responsibility for missing or incompatible items should be agreed before installation.
Will I receive certification?
The completed work will be inspected and tested, and the applicable electrical completion certification will be provided.
Plan the electrical work

Renovating your home?

Tell us what you are changing, what stage the project has reached and when electrical work is needed.