How each room will be used
Plan sockets, switches, data points and lighting around furniture, appliances and everyday movement.
Plan the electrical side of your renovation before walls close and finishes go in. Forward Electrical handles design input, first fix, second fix, upgrades, testing and certification.
Socket positions, lighting circuits, kitchen loads and future technology are easiest to solve before plastering, joinery and decoration begin.
Discuss your renovationPlan sockets, switches, data points and lighting around furniture, appliances and everyday movement.
Confirm appliances and dedicated circuits before cabinetry and finished surfaces restrict access.
Choose practical switching positions, dimming, feature lighting and outdoor controls at design stage.
Assess whether the fuse board, earthing, bonding and existing circuits can support the proposed work.
Consider EV charging, solar, heat pumps, home offices, security and data cabling while access is available.
From a kitchen refit to a substantial extension, the electrical scope is built around the property and the plans.
Practical input on socket, switch, light, appliance and equipment positions before work begins.
New or altered circuits for renovated rooms, extensions and additional electrical demand.
Circuits and connection points for cooking, refrigeration, extraction, lighting and countertop use.
Suitable lighting, extraction, electric showers and other work planned for the bathroom environment.
General, task, feature, security and garden lighting with appropriate switching and controls.
Additional sockets, TV points and structured cabling for work, entertainment and connected devices.
Review of existing capacity and protection, with replacement where the board is unsuitable for the new work.
Fuse board replacement →Replacement of existing wiring where inspection, testing and the renovation scope show it is required.
Read about home rewiring →Final inspection, testing and applicable completion certification for the completed electrical work.
Electrical work is delivered in stages so cabling goes in before surfaces close and finished fittings are protected from heavy building work.
Clear decisions and timely access help keep the electrical package aligned with the wider build.
Send the address, plans where available, project stage, expected dates and the main work being completed.
We review the existing installation and discuss how the renovated rooms need to work.
The agreed scope sets out the electrical work, assumptions and identifiable upgrade requirements.
Visits are coordinated around demolition, framing, plastering, joinery and installation of finished equipment.
The finished installation is checked, circuits are identified and the applicable certification is provided.
Late layout changes can mean reopening finished surfaces, moving cabinetry or compromising the result. Early decisions give the electrician, builder and other trades a shared plan.
Forward Electrical is Safe Electric Registered. Completed electrical work is inspected and tested, with the applicable certification provided for your records.
For electrical work in the home, the Commission for Regulation of Utilities advises using a Safe Electric Registered Electrical Contractor.
Forward Electrical provides home renovation electrical work across its established service area. Contact us if your location is not listed and we will confirm availability.
Our detailed guide explains the factors that affect rewire scope, access, disruption and cost.
Tell us what you are changing, what stage the project has reached and when electrical work is needed.